Projects · Pool
Pool construction in Playa Flamenca



Before / after
Drag to compare this project


Before
After
↔
A built-in pool with integrated jacuzzi, finished with natural stone edging and Mediterranean-blue tiling, built in the back garden of a villa in Playa Flamenca.
The project included the council permit, earthworks, structure, filtration system and water heating, delivered turnkey in 8 weeks.
- Area
- Playa Flamenca, Orihuela Costa
- Type of work
- Pool construction
- Approx. surface area
- 32 m² water surface
- Duration
- 8 weeks
- Area
- Orihuela Costa
Keep exploring
More projects
See all projects → · More about outdoor spaces, pools and terraces →