How much does a bathroom renovation cost in Torrevieja?
The bathroom is the coast's most requested renovation alongside the kitchen — and the one that raises the most price questions. Here are the real 2026 ranges for Torrevieja and Orihuela Costa, what each tier includes, and the area's number-one partial job: swapping the bathtub for a walk-in shower.
Complete bathroom renovation prices in 2026
| Bathroom renovation | Estimated range |
|---|---|
| Complete bathroom, mid-range | €3,500–8,000 |
| Complete bathroom, high-end | €8,000–15,000 |
The mid-range covers a complete bathroom with plumbing, tiling, sanitaryware and shower screen, using national-brand materials. High-end adds large-format porcelain, concealed taps, made-to-measure units or ceiling-height tempered glass screens. A complete bathroom typically takes 2 to 4 weeks; the full service detail is on the kitchens and bathrooms page.
Bath-to-shower conversion: the area's most requested job
With so much of the housing stock built between the 1970s and 1990s, the original bathtub is still in place in thousands of bathrooms across Torrevieja and Orihuela Costa — and replacing it with a walk-in shower tray is the partial job we're asked for most: for accessibility, for comfort, and because it modernises the bathroom without renovating all of it.
The work involves demolishing and removing the bath, re-running the drain at the new level, fitting the tray (tiled or resin), re-tiling the affected area and installing the screen. As a contained intervention, it costs noticeably less than a complete bathroom: where it lands within that reference depends on the tray type, the screen you choose and how many square metres of tiling need replacing. Since it doesn't touch structure or façade, the usual paperwork is a declaración responsable (the simplified notification-based permit), not a full building licence.
What moves a bathroom price in this area
Three factors explain almost all the variation between quotes. The state of the installations: in 1970s-90s properties with original plumbing it usually pays to renew the feeds and drains while the bathroom is open, and that shows in the plumbing line item. The quality specification: the same bathroom with national or imported sanitaryware, or ceramic versus rectified porcelain tiling, changes tier. And access: a flat without a lift makes materials and rubble handling more expensive than a townhouse or villa with its own plot. Every range in this guide — plus the rest of the home — is gathered in the general 2026 price guide.
FAQ
The bathroom questions we hear most
How much does a complete bathroom renovation cost?
In Torrevieja and Orihuela Costa, a complete mid-range bathroom costs between €3,500 and €8,000, including plumbing, tiling, sanitaryware and shower screen. High-end, between €8,000 and €15,000. These are estimated 2026 ranges: the fixed quote comes from the free technical visit.
Can I renovate a bathroom for €2,000?
A complete renovation done properly — unlikely: below the €3,500 threshold the realistic options are partial jobs such as replacing a toilet or basin, changing the taps or fitting a new shower screen. On a tight budget, a well-chosen partial job usually delivers more than a full renovation with quality cut to the bone.
How much does a bath-to-shower conversion cost?
It's a contained intervention within the bathroom, noticeably below the cost of a complete renovation (€3,500–8,000 mid-range). Where it lands exactly depends on the tray type (tiled or resin), the screen and the square metres of tiling to replace; we fix it item by item after the free technical visit.
Do I need a permit to renovate a bathroom?
For a bathroom that doesn't touch structure, façade or built volume — the normal case, bath-to-shower conversions included — a declaración responsable (simplified notification-based permit) is enough, and we handle it. In Orihuela Costa it's processed at the municipal office on the N-332 in Playa Flamenca, with no trip to Orihuela town.
How long does a bathroom renovation take?
A complete bathroom, 2 to 4 weeks with the handover date fixed in the quote. A bath-to-shower conversion, being a contained job, considerably less — depending on the extent of tiling and the tray type.
Does the price include removing the bath and the rubble?
Yes: in our fixed quotes the demolition, removal of the bath and rubble disposal through an authorised waste manager are included in the line items — no surprises halfway through.
Estimated 2026 prices, not binding. The final price comes from the free technical site visit and depends on quality specification, access to the property and starting condition.